Notice of Meeting

 

 

 

 

 

bsc_logo_150dpi_rgb

 

 

 

Sustainability and Emissions Reduction Advisory Committee Meeting

 

 

An Sustainability and Emissions Reduction Advisory Committee Meeting of Byron Shire Council will be held as follows:

 

Venue

Conference Room, Station Street, Mullumbimby

Date

Thursday, 14 March 2019

Time

9.00am

 

 

 

 

 

Shannon Burt

Director Sustainable Environment and Economy                                                            I2019/371

                                                                                                                                    Distributed 07/03/19

 

 


CONFLICT OF INTERESTS

What is a “Conflict of Interests” - A conflict of interests can be of two types:

Pecuniary - an interest that a person has in a matter because of a reasonable likelihood or expectation of appreciable financial gain or loss to the person or another person with whom the person is associated.

Non-pecuniary – a private or personal interest that a Council official has that does not amount to a pecuniary interest as defined in the Local Government Act (eg. A friendship, membership of an association, society or trade union or involvement or interest in an activity and may include an interest of a financial nature).

Remoteness – a person does not have a pecuniary interest in a matter if the interest is so remote or insignificant that it could not reasonably be regarded as likely to influence any decision the person might make in relation to a matter or if the interest is of a kind specified in Section 448 of the Local Government Act.

Who has a Pecuniary Interest? - a person has a pecuniary interest in a matter if the pecuniary interest is the interest of the person, or another person with whom the person is associated (see below).

Relatives, Partners - a person is taken to have a pecuniary interest in a matter if:

§  The person’s spouse or de facto partner or a relative of the person has a pecuniary interest in the matter, or

§  The person, or a nominee, partners or employer of the person, is a member of a company or other body that has a pecuniary interest in the matter.

N.B. “Relative”, in relation to a person means any of the following:

(a)   the parent, grandparent, brother, sister, uncle, aunt, nephew, niece, lineal descends or adopted child of the person or of the person’s spouse;

(b)   the spouse or de facto partners of the person or of a person referred to in paragraph (a)

No Interest in the Matter - however, a person is not taken to have a pecuniary interest in a matter:

§  If the person is unaware of the relevant pecuniary interest of the spouse, de facto partner, relative or company or other body, or

§  Just because the person is a member of, or is employed by, the Council.

§  Just because the person is a member of, or a delegate of the Council to, a company or other body that has a pecuniary interest in the matter provided that the person has no beneficial interest in any shares of the company or body.

Disclosure and participation in meetings

§  A Councillor or a member of a Council Committee who has a pecuniary interest in any matter with which the Council is concerned and who is present at a meeting of the Council or Committee at which the matter is being considered must disclose the nature of the interest to the meeting as soon as practicable.

§  The Councillor or member must not be present at, or in sight of, the meeting of the Council or Committee:

(a)   at any time during which the matter is being considered or discussed by the Council or Committee, or

(b)   at any time during which the Council or Committee is voting on any question in relation to  the matter.

No Knowledge - a person does not breach this Clause if the person did not know and could not reasonably be expected to have known that the matter under consideration at the meeting was a matter in which he or she had a pecuniary interest.

Participation in Meetings Despite Pecuniary Interest (S 452 Act)

A Councillor is not prevented from taking part in the consideration or discussion of, or from voting on, any of the matters/questions detailed in Section 452 of the Local Government Act.

Non-pecuniary Interests - Must be disclosed in meetings.

There are a broad range of options available for managing conflicts & the option chosen will depend on an assessment of the circumstances of the matter, the nature of the interest and the significance of the issue being dealt with.  Non-pecuniary conflicts of interests must be dealt with in at least one of the following ways:

§  It may be appropriate that no action be taken where the potential for conflict is minimal.  However, Councillors should consider providing an explanation of why they consider a conflict does not exist.

§  Limit involvement if practical (eg. Participate in discussion but not in decision making or vice-versa).  Care needs to be taken when exercising this option.

§  Remove the source of the conflict (eg. Relinquishing or divesting the personal interest that creates the conflict)

§  Have no involvement by absenting yourself from and not taking part in any debate or voting on the issue as if the provisions in S451 of the Local Government Act apply (particularly if you have a significant non-pecuniary interest)

RECORDING OF VOTING ON PLANNING MATTERS

Clause 375A of the Local Government Act 1993 – Recording of voting on planning matters

(1)   In this section, planning decision means a decision made in the exercise of a function of a council under the Environmental Planning and Assessment Act 1979:

(a)   including a decision relating to a development application, an environmental planning instrument, a development control plan or a development contribution plan under that Act, but

(b)   not including the making of an order under Division 2A of Part 6 of that Act.

(2)   The general manager is required to keep a register containing, for each planning decision made at a meeting of the council or a council committee, the names of the councillors who supported the decision and the names of any councillors who opposed (or are taken to have opposed) the decision.

(3)   For the purpose of maintaining the register, a division is required to be called whenever a motion for a planning decision is put at a meeting of the council or a council committee.

(4)   Each decision recorded in the register is to be described in the register or identified in a manner that enables the description to be obtained from another publicly available document, and is to include the information required by the regulations.

(5)   This section extends to a meeting that is closed to the public.

 


BYRON SHIRE COUNCIL

Sustainability and Emissions Reduction Advisory Committee Meeting

 

 

BUSINESS OF MEETING

 

1.    Apologies

2.    Declarations of Interest – Pecuniary and Non-Pecuniary

3.    Adoption of Minutes from Previous Meetings

3.1       Sustainability and Emissions Reduction Advisory Committee Meeting held on 25 October 2018

4.    Staff Reports

Sustainable Environment and Economy

4.1       2019 Meeting dates........................................................................................................... 4

4.2       Sustainability and Emissions Reduction Projects - Update Report.................................. 6

4.3       Minutes of previous meeting held 25 October 2018....................................................... 11

4.4       Council's Climate Change Adaptation Processes - discussion....................................... 17

4.5       Updates from Zero Emissions Byron and COREM........................................................ 27

4.6       Update from Cr Coorey - climate change issues........................................................... 29

4.7       Issues raised with Council on renewable energy projects.............................................. 31   

 

 


BYRON SHIRE COUNCIL

Staff Reports - Sustainable Environment and Economy                                     4.1

 

 

Staff Reports - Sustainable Environment and Economy

 

Report No. 4.1             2019 Meeting dates

Directorate:                 Sustainable Environment and Economy

Report Author:           Michelle Chapman, Project Support Officer

File No:                        I2019/43

Theme:                         Sustainable Environment and Economy

                                      Planning Policy and Natural Environment

 

 

Summary:

 

This report advises the Committee of the adopted 2019 Sustainability and Emissions Reduction Advisory Committee meeting dates.

 

Point 12 of the Constitution of the Committee advises, in regard to convening meetings:

 

Meetings will be held as required, generally every quarter.  An annual timetable of meetings will be prepared in advance, and adopted by Council every October/November for the following 12 months. A meeting of the committee may be convened in response to either the direction of the Mayor (or in the Mayor’s absence the Deputy Mayor) in written form to the General Manager; or two Councillors in written form to the General Manager, or by resolution of the Council.

 

  

 

RECOMMENDATION:

That the Sustainability and Emissions Reduction Advisory Committee note the 2019 meeting dates.

 

 

 

 

 


 

REPORT

 

Background

At 13 December Council meeting, the following dates were adopted by Council to hold the Sustainability and Emissions Reduction Advisory Committee 2019 meetings on:

·    Thursday 14 March at 9.00am

·    Thursday 8 August at 9.00am

·    Thursday 31 October at 11.30am.

 

Options

The Committee may recommend that additional meeting dates be arranged. Another meeting day, in lieu of a Thursday, should be considered as an option if this were to occur as there would be few vacant Thursday dates available.

 

STRATEGIC CONSIDERATIONS

 

Community Strategic Plan and Operational Plan

 

CSP Objective

L2

CSP Strategy

L3

DP Action

Community Objective 3:  We protect and enhance our natural environment

3.2

Strive to become a sustainable community  

3.2.1

Work towards Council's zero-emissions  target

 

Community Objective 3:  We protect and enhance our natural environment

3.2

Strive to become a sustainable community  

3.2.2

Support community environmental and sustainability projects

 

 

Legal/Statutory/Policy Considerations

Nil

 

Financial Considerations

Nil

 

Consultation and Engagement

Not applicable


BYRON SHIRE COUNCIL

Staff Reports - Sustainable Environment and Economy                                     4.2

 

 

Report No. 4.2             Sustainability and Emissions Reduction Projects - Update Report

Directorate:                 Sustainable Environment and Economy

Report Author:           Hayley Briggs, Sustainability and Emissions Reduction Officer

Coral Latella, Sustainability Officer

File No:                        I2019/211

                                       

 

 

Summary:

 

This report provides a short update on the key sustainability and emissions reduction projects across Council. Project managers will speak to their items.

 

 

  

 

RECOMMENDATION:

That the Sustainability and Emissions Reduction Advisory Committee note the report on key projects.

 

 

Attachments:

 

1        Confidential - Attachment 1 to Sustainability and Emissions Reduction Advisory Committee (SERAC) Key Project Updates Report - Energy Matrix for Council Projects (WORKING DRAFT; CONFIDENTIAL) 14 March 2019, E2019/13644  

 

 


 

REPORT

 

Resource Recovery Key Projects

 

Dingo Lane, Myocum Solar Farm project

·    Presentation of preliminary business case findings to November Councillor SPW

·    Detailed network enquiry by Essential Energy has been completed and the report issued in late January 2019. The report findings are currently being reviewed by Staff and Consultants.

·    The initial project preliminary business case and internal OLG Capital Expenditure Review internal Business Case Analysis will be updated with results from the Essential Energy detailed network enquiry.

·    Report to Council with recommended next steps based on above in April 2019

 

Utilities Key Projects

 

Bioenergy Project

Tender documents are being prepared for a Bankable Feasibility Study and Business Case. Key project dates are:

 

Tender Received

April 2019

Under Review

May 2019

Council Contract Decision

Aug 2019

Council Decision re Design & Construct Bioenergy Plant

Aug 2019

Design and Construct Contract Award

Sept 2019

Bioenergy Plant Operation Start up

Dec 2020

 

Brunswick Valley Sustainability Centre

·    The project has slowed in recent months. The project management team is being reorganised to speed up this process. The team plans to present its draft project management plan to relevant stakeholders in the coming months, with the overarching approach of dividing the project into five smaller chunks with each section having its own task manager:

1.   Community solar

2.   Nursery and big scrub

3.   Walkway and river bank stabilisation

4.   Community education centre / affordable housing

5.   Coppice or biomass crops

·    General: meetings with Council’s Community Services and Governance teams have taken place to start up a rigorous community consultation/participation process.

·    Community solar: the Community Solar Farm Expression of Interest has been prepared. Decision and report pending regarding the land rent charged for the use of sewage treatment plant land for the community solar farm.

·    Nursery and big scrub: work is underway to proceed with the rehabilitation of the on-site nursery to facilitate the occupation of the Big Scrub Reforestation team and other community groups.

 

Solar PV at 3 x Sewage Treatment Plant

•     Request for Tender 2018-0020 – Design, Construct and Install of Solar PV at 3 Byron Shire Council STP sites namely Bangalow, Byron Bay and Brunswick STP’s received and reviewed. Tender Evaluation report will be completed shortly with GM approval pending.

 

Sustainability Team Key Projects

 

Mullumbimby Administration Building Solar Carpark

·    This project is being jointly delivered by Sustainable Environment & Economy and Infrastructure Services.

·    The Request for Tender closed on 29 January 2019. Four submissions were received.

·    The Tender Evaluation Panel is met on 05 February 2019 to make a decision on the submissions. At the 21 February 2019 Planning Meeting, Council awarded the contract to the winning tenderer. The name of the winning tenderer will remain confidential until tenderers are notified.

·    The project is expected to be complete between 30 June and 30 September 2019.

 

Emissions Reduction Strategy

·    The draft Emissions Reduction Strategy, Net Zero Emissions Strategy for Council Operations 2025, was endorsed for public exhibition at the Ordinary Council Meeting of 13 December 2018. The draft Strategy is on exhibition for six weeks from 27 February until 10 April 2019.

·    Public responses will be collated and incorporated into the draft where relevant in April and May, with the final version of the Strategy to go to the Council Planning Meeting of 20 June 2019 for endorsement.

·    Staff have engaged a consultant to run scenario trajectory projections for Council to achieve net zero emissions by 2025. The work produced from that project (scenario trajectory graphs etc.) will be included in the final version of the Strategy.

 

Sustainable Events Toolkit

·    The Toolkit is a collaboration between the Events Team and the Sustainability Team and integrates a range of sustainability guidelines and actions into one comprehensive event planning document.

·    The draft Toolkit will be aimed at small and large scale community events held in the Byron Shire in addition to internal Council events and functions.

·    A Sustainable Events Roundtable will be held in March where event organisers from a range of community run events and markets in the area will come together with Council staff to discuss the Toolkit and broader sustainability issues around our local events.

·    The Toolkit is due for completion by 30 June 2019.

 

Clean Energy Council (CEC) – Best Practice Charter for Renewable Energy Developments

·    In November 2018, Mayor Richardson requested that staff investigate the possibility of Council committing to the CEC’s Best Practice Charter for Renewable Energy Developments.

·    Staff contacted the CEC to request further information on the Charter and to ascertain whether Council was eligible to commit. The information received was that:

The Best Practice Charter for Renewable Energy Developments is a voluntary set of commitments for CEC members designed to communicate the standards that the signatories will uphold in the development of current and new clean energy projects. The Charter outlines a commitment by signatories to engage respectfully with the communities in which they plan and operate projects, to be sensitive to environmental and cultural values and to make a positive contribution to the regions in which they operate.

Only CEC members who pay an annual fee can commit to the Charter. The CEC is aimed at industry bodies. Membership is not intended for governmental organisations, nor have any public sector organisations joined. Council does not fit into any of the existing CEC member categories:    

a)   Associate (open to small businesses – “relatively small organisations operating in the dynamic energy space”) – annual fee $3,650;

b)   Corporate (open to all companies “leading organisations in a sector, looking to develop their profile in the clean energy sector”) – annual fee $14,500; and

c)   Sponsoring (open to all companies – “major players in the clean energy industry”) – annual fee $55,500.

·    Given the above, staff determined that Council is unable to commit to the Charter due to not meeting the CEC member criteria, and that further investigation into becoming a member is not warranted given that membership is not intended for governmental organisations.

 

Energy Matrix

·    The Sustainability Team coordinates the Energy Matrix, a living document that details completed and future energy projects across Council, Attachment 1.

 

STRATEGIC CONSIDERATIONS

 

Community Strategic Plan and Operational Plan

 

CSP Objective

L2

CSP Strategy

L3

DP Action

L4

OP Activity

Community Objective 1:  We have infrastructure, transport and services which meet our expectations

1.5

Provide continuous urban water and sewerage services within the Shire

1.5.1

Increase the energy efficiency of Sewerage treatment Plants

1.5.1.1

Expand solar farms at Bangalow; Byron and Brunswick Valley Sewage Treatment plants

Community Objective 3:  We protect and enhance our natural environment

3.2

Strive to become a sustainable community  

3.2.1

Work towards Council's zero-emissions  target

3.2.1.1

Prepare Emissions Reduction Strategy

Community Objective 3:  We protect and enhance our natural environment

3.2

Strive to become a sustainable community  

3.2.1

Work towards Council's zero-emissions  target

3.2.1.2

Prepare Bioenergy Project Plan

Community Objective 3:  We protect and enhance our natural environment

3.2

Strive to become a sustainable community  

3.2.1

Work towards Council's zero-emissions  target

3.2.1.3

Build community Solar Farms at Brunswick Valley STP

Community Objective 3:  We protect and enhance our natural environment

3.2

Strive to become a sustainable community  

3.2.1

Work towards Council's zero-emissions  target

3.2.1.4

Implement actions to achieve zero emissions by 2025

Community Objective 3:  We protect and enhance our natural environment

3.2

Strive to become a sustainable community  

3.2.2

Support community environmental and sustainability projects

3.2.2.1

Provide environmental and sustainability information

 

 

Legal/Statutory/Policy Considerations

Draft Net Zero Emissions Strategy for Council Operations 2025

 

Financial Considerations

This is a project update report only. Financial considerations for individual projects have been or will be considered on a case by case basis. Sustainability and emissions reduction projects have the potential to either cost or save Council money.

 

Consultation and Engagement

Water Sewer Systems Environment Officer, Infrastructure Services 

Team Leader Resource Recovery and Quarry, Infrastructure Services

Civil Engineer, Infrastructure Services

 


BYRON SHIRE COUNCIL

Staff Reports - Sustainable Environment and Economy                                     4.3

 

 

Report No. 4.3             Minutes of previous meeting held 25 October 2018

Directorate:                 Sustainable Environment and Economy

Report Author:           Michelle Chapman, Project Support Officer

File No:                        I2019/239

                                       

 

 

Summary:

 

The minutes of the previous Sustainability and Emissions Reduction Advisory Committee meeting held on 25 October 2018 referred to at Item 3 of this meeting’s agenda, are attached.

 

 

  

 

RECOMMENDATION:

That the Sustainability and Emissions Reduction Advisory Committee note the minutes of 30 August 2018 meeting which were reported to 18 October Council meeting.

 

 

Attachments:

 

1        Minutes 25/10/2018 Sustainability and Emissions Reduction Advisory Committee, I2018/2005 , page 13  

 

 


 

REPORT

 

The minutes of the previous Sustainability and Emissions Reduction Advisory Committee meeting held on 25 October 2018 are attached and available at

https://byron.infocouncil.biz/RedirectToDoc.aspx?URL=Open/2018/10/SERAC_25102018_MIN_878.PDF .

 

The minutes were reported to 22 November Council meeting, resulting in Resolutions 18-736 to note the minutes and Res 18-737 to adopt Committee Recommendation 4.4.1 - Climate Emergency Declaration.

 

STRATEGIC CONSIDERATIONS

 

Community Strategic Plan and Operational Plan

 

CSP Objective

L2

CSP Strategy

L3

DP Action

Community Objective 3:  We protect and enhance our natural environment

3.2

Strive to become a sustainable community  

3.2.1

Work towards Council's zero-emissions  target

 

Community Objective 3:  We protect and enhance our natural environment

3.2

Strive to become a sustainable community  

3.2.2

Support community environmental and sustainability projects

 

 

 

Legal/Statutory/Policy Considerations

Nil

 

Financial Considerations

Nil

 

Consultation and Engagement

Not applicable

 

 


BYRON SHIRE COUNCIL

Staff Reports - Sustainable Environment and Economy                          4.3 - Attachment 1

Minutes of Meeting

 

 

 

 

 

bsc_logo_150dpi_rgb

 

 

 

Sustainability and Emissions Reduction Advisory Committee Meeting

 

 

 

Venue

Conference Room, Station Street, Mullumbimby

Date

Thursday, 25 October 2018

Time

11.30am

 

 

 

 

 

 

 

 


 

Minutes of the Sustainability and Emissions Reduction Advisory Committee Meeting held on Thursday, 25 October 2018

File No: Error! Unknown document property name.

 

PRESENT:   Cr S Richardson, Cr M Lyon, Cr S Ndiaye, Cr C Coorey

 

Staff:   Shannon Burt (Director Sustainable Environment and Economy)

            Sharyn French (Manager Environmental and Economic Planning)

            Tania Crosbie (Economy and Sustainability Coordinator)

            Hayley Briggs (Sustainability and Emissions Reduction Officer)

            Daniel Harper (Sustainability Officer)

            Phil Holloway (Director Infrastructure Services)

            Claudio Germany (Assistant Environment Officer, Infrastructure Services)

            Jessica Huxley (Contractor, Infrastructure Services)

            Kane Goldsworthy (Environmental Programs Officer, Infrastructure Services)

 

 

Community:                                                                                          Luke McConell

                     Chris Sanderson

                     Anthony Pangallo

                     Vicki Brooke for John Taberner (ZEP representative)

                     Ella Goninan (COREM representative)

 

 

Cr Richardson (Chair) opened the meeting at 11.35am and acknowledged that the meeting was being held on Bundjalung Country.

 

Apologies:

 

Joanna Immig, John Taberner, Lloyd Isaacson (Team Leader Resource Recovery and Quarry) Coral Latella (Sustainability Officer)

 

Declarations of Interest – Pecuniary and Non-Pecuniary

 

There were no declarations of interest.

 

Adoption of Minutes from Previous Meetings

 

Committee Recommendation:

That the minutes of the Sustainability and Emissions Reduction Advisory Committee Meeting held on 30 August 2018 be confirmed.

(Richardson/Sanderson)

The recommendation was put to the vote and declared carried.

 

Note: The minutes of the meeting held on 30 August 2018 were noted, and the Committee Recommendations adopted by Council, at the Ordinary Meeting held on 18 October 2018.

 

Business Arising from Previous Minutes

 

There was no business arising from previous minutes.

 

 

 

Staff Reports - Sustainable Environment and Economy

Report No. 4.1             Code of Conduct Policy

File No:                        I2018/1976

 

Committee Recommendation:

That the Sustainability and Emissions Reduction Advisory Committee note the Code of Conduct Policy and return signed acknowledgement form, Attachment 3 (E2018/25100).

(McConell/Sanderson)

The recommendation was put to the vote and declared carried.

 

 

Report No. 4.2             Minutes of previous meeting held 30 August 2018

File No:                        I2018/1918

 

Committee Recommendation:

That the Sustainability and Emissions Reduction Advisory Committee note the minutes of 30 August 2018 meeting which were reported to 18 October Council meeting.

(Sanderson/Richardson)

The recommendation was put to the vote and declared carried.

 

 

Report No. 4.3             Updates from Zero Emissions Byron and COREM

File No:                        I2018/1923

 

Committee Recommendation:

That the Sustainability and Emissions Reduction Advisory Committee note the updates from ZEB and COREM.

(Lyon/Pangallo)

The recommendation was put to the vote and declared carried.

 

 

Report No. 4.4             Climate Emergency Declaration

File No:                        I2018/1987

 

Committee Recommendation:

1.       That the Sustainability and Emissions Reduction Advisory Committee provides the following input into terms of reference, membership for, and where Council has a role to play in a community-led Climate Emergency Guidance Group as it develops a Shire-wide Community Climate Emergency Plan:

 

a)      That the Terms of Reference for the community-led climate change adaptation plan consider:

i)       resilience in coastal erosion risk & sea level rise areas

ii)      agriculture

iii)     heat waves

iv)     bush fires

v)      floods

vi)     social dislocation / impacts

vii)    food security.

 

b)      That the following be invited via newspaper ad, email, or direct contact to the first meeting to be held in about a month with Cr Coorey to be champion of meeting:

·     Foundation for Rural & Regional Renewal (FRRR),

·     Zero Emissions Byron (ZEB),

·     disaster and emergency response,

·     social services.

 

c)      That the Scope be:

i)       implementation plan/ action checklist;

ii)      acknowledging and supporting work already being done by existing mitigation groups (including ZEB and Community-Owned Renewable Energy Mullumbimby [COREM])

iii)     identifying gaps.

 

d)      That Council support through facilitation of the initial meeting and identify desirable membership that covers the Shire and areas listed in the first dot point..

(Ndiaye/Goninan)

The recommendation was put to the vote and declared carried.

 

 

Report No. 4.5             SERAC Key Project Updates

File No:                        I2018/1916

 

Committee Recommendation:

That the Sustainability and Emissions Reduction Advisory Committee note the report.

 

(Sanderson/ Brooke)

The recommendation was put to the vote and declared carried.

 

 

Report No. 4.6             Emissions Reduction Strategy - Update & First Draft

File No:                        I2018/1946

 

Committee Recommendation:

1.       That the Sustainability and Emissions Reduction Advisory Committee note the report.

 

2.       That members of the Sustainability and Emissions Reduction Advisory Committee provide electronic feedback on the working draft Net Zero Emissions Strategy for Council Operations 2025 (E2018/83561) by Close of Business Monday 5 November.

 

(Lyon/Pangallo)

The recommendation was put to the vote and declared carried.

     

 

 

 

There being no further business the meeting concluded at 1.33pm.

 


BYRON SHIRE COUNCIL

Staff Reports - Sustainable Environment and Economy                                     4.4

 

 

Report No. 4.4             Council's Climate Change Adaptation Processes - discussion

Directorate:                 Sustainable Environment and Economy

Report Author:           Hayley Briggs, Sustainability and Emissions Reduction Officer

File No:                        I2019/252

                                       

 

 

Summary:

 

This report provides information on Council’s previous and current climate change adaptation processes for consideration by members of the Sustainability and Emissions Reduction Advisory Committee. The information is intended to facilitate discussion among members on Council’s approach to climate change adaptation processes going forward.

 

 

  

 

RECOMMENDATION:

1.       That the Sustainability and Emissions Reduction Advisory Committee note the report Council’s Climate Change Adaptation Processes - Update Report (Attachment 1 – I2019/25).

 

2.       That the Sustainability and Emissions Reduction Advisory Committee note that there is currently no resourcing allocated to updating Council’s Climate Change Adaptation Implementation Plan, and that any requests for funding will be considered against other Council priorities as part of the preparation of the draft 2019/20 Operational Plan and Budget.  

 

 

 

 

Attachments:

 

1        Report 21/02/2019 Planning Council's Climate Change Adaptation Processes - Update Report, I2019/25 , page 20  

 

 


 

REPORT

 

At the ordinary Council Meeting of 13 December 2018, Council passed Resolution 18-841 requesting staff provide an update report to the next available meeting on Council’s climate change adaptation processes for rising temperatures, emergencies, asset maintenance, and water resources in a changing environment.

 

The requested update report on Council’s climate change adaptation processes was reported to the Planning Meeting of 21 February 2019, where Council passed Resolution 19-011 consisting of two parts:

 

1.    to consider the development of an updated Climate Change Adaptation Implementation Plan for Council operations in the preparation of the draft 2019/20 Operational Plan and an allocation of $80,000 in the preparation of the draft 2019/20 Budget; and

 

2.    that the Climate Change Adaptation Process be made an agenda item at the next meeting of the Sustainability and Emissions Reduction Advisory Committee for consideration.

 

This report fulfils part two of Resolution 19-011.

 

Key issues

 

Background

The update report on Council’s climate change adaptation processes is Attachment 1 to this report.   

 

Climate change adaptation processes in Byron Shire currently occur at Council and at the regional level through Rous County Council and the New South Wales Government. Byron Shire Council supports Rous County Council who is planning for a reduced water supply in the region, and participates in regional adaption measures coordinated by the New South Wales Office of Environment and Heritage.    

 

Council itself has been active in the climate change adaptation space for some time, but delivery of actions has been piecemeal. In 2008, Byron and Tweed Shire Councils were jointly awarded federal government funding to engage a consultant to undertake a comprehensive risk assessment of the potential impacts of climate change on Council services and activities, and to recommend possible adaptation planning processes. From this work, Council resolved to adopt a Climate Change Adaptation Implementation Schedule (which included additional actions separately identified by Council). While the Schedule was not resourced, Council has still been somewhat proactive in the adaptation space with some actions being delivered through other projects on an ad hoc basis. Council’s most comprehensive current climate change adaptation document, the Climate Change Strategic Planning Policy, provides guidance on future flood, coastline management and biodiversity planning.

 

Due to the age of the Climate Change Adaptation Implementation Schedule and the fact that it was not resourced or implemented in a consistent manner, the update report recommended that Council develop an updated Climate Change Adaptation Implementation Plan. Council resolved to consider the development of an updated Climate Change Adaptation Implementation Plan for Council operations in the preparation of the draft 2019/20 Operational Plan and an allocation of $80,000 in the preparation of the draft 2019/20 Budget (res-19-011).

 

More detailed information on Council’s history in the adaptation space and current adaptation strategies and policies can be found in the report to Council, Attachment 1. 

 

 

Resourcing

Consideration of Council’s climate change adaptation approach going forward should take into account the fact that there is currently no resourcing allocated to updating Council’s Climate Change Adaptation Implementation Plan, and that any requests for funding will be considered against other Council priorities as part of the preparation of the draft 2019/20 Operational Plan and Budget.  

 

Legal/Statutory/Policy Considerations

Byron Shire Council Climate Change Strategic Planning Policy

 

Financial Considerations

At the Planning Meeting of 21 February 2019, Council resolved to consider the development of an updated Climate Change Adaptation Implementation Plan for Council operations in the preparation of the draft 2019/20 Operational Plan and an allocation of $80,000 in the preparation of the draft 2019/20 Budget (res-19-011). This report was not reviewed by the Finance Manager as the proposed funding allocation will be considered at a later date as part of the 2019/20 Budget.

 

Consultation and Engagement

n/a

 

 


BYRON SHIRE COUNCIL

Staff Reports - Sustainable Environment and Economy                          4.4 - Attachment 1

Report No. 6.3             Council's Climate Change Adaptation Processes - Update Report

Directorate:                 Sustainable Environment and Economy

Report Author:           Hayley Briggs, Sustainability and Emissions Reduction Officer

File No:                        I2019/25

Theme:                         Sustainable Environment and Economy

                                      Planning Policy and Natural Environment

 

 


Summary:

This report provides an update on Council’s climate change adaptation processes as requested by Council at the 13 December 2018 meeting (Res 18-841). 

 

Climate change adaptation processes in Byron Shire currently occur at Council and at the regional level through Rous County Council and the New South Wales Government. Byron Shire Council supports Rous County Council who is planning for a reduced water supply in the region, and participates in regional adaption measures coordinated by the New South Wales Office of Environment and Heritage.    

 

Council itself has been active in the climate change adaptation space for some time, but delivery of actions has been piecemeal. In 2008, Byron and Tweed Shire Councils were jointly awarded federal government funding to engage a consultant to undertake a comprehensive risk assessment of the potential impacts of climate change on Council services and activities, and to recommend possible adaptation planning processes. From this work, Council resolved to adopt a Climate Change Adaptation Implementation Schedule (which included additional actions separately identified by Council). While the Schedule was not resourced, Council has still been somewhat proactive in the adaptation space with some actions being delivered through other projects on an ad hoc basis. Council’s most comprehensive current climate change adaptation document, the Climate Change Strategic Planning Policy, provides guidance on future flood, coastline management and biodiversity planning.

 

Due to the age of the Climate Change Adaptation Implementation Schedule and the fact that it was not resourced or implemented in a consistent manner, it is recommended that Council develop an updated Climate Change Adaptation Implementation Plan.

 


  


 

RECOMMENDATION:

That Council consider the development of an updated Climate Change Adaptation Implementation Plan for Council operations in the preparation of the draft 2019/20 Operational Plan and an allocation of $80,000 in the preparation of the draft 2019/20 Budget.

 


Attachments:

 

1        Byron and Tweed Shire Councils Climate Change Risk Assessment Final Report, May 2009, DM862857 

2        Byron and Tweed Shire Councils Climate Change  Adaptation Action Plan, June 2009, DM877053 

3        Byron Shire Climate Change Adaptation Implementation Schedule - with recommended amendments from Res 10-408, DM977169 

 

 



REPORT

 

At the ordinary Council Meeting of 13 December 2018, Council passed Resolution 18-841 requesting staff provide an update report to the next available meeting on Council’s climate change adaptation processes for rising temperatures, emergencies, asset maintenance, and water resources in a changing environment.

 

Background

There are two main policy responses to climate change: mitigation and adaptation.

 

Mitigation addresses the root causes of climate change by reducing greenhouse gas emissions. Council has been conducting work in the mitigation space since 2004 and continues to do so with its goals of net zero emissions for Council operations by 2025 and 100% renewable energy by 2027.

 

Adaptation is the process by which strategies to moderate, cope with and take advantage of the consequences of climatic events, are enhanced, developed, and implemented (United Nations Development Programme, 2005). Adaptation can be either a planned, proactive response to climate change or a reactive adjustment to climate change impacts after they have occurred.

 

Proactive adaptation processes in Byron Shire are currently occurring here at Council as well as at the regional level through Rous County Council and the New South Wales (NSW) Government. Given that climate change is a global phenomenon that will not affect Byron Shire in isolation, coordinated regional approaches often deliver the most effective outcomes.

 

Council strategies and policies

Council has been engaged in climate change adaptation work for over a decade. In May 2008 Byron Shire Council and Tweed Shire Council were jointly awarded funds from the Australian Department of Climate Change for the joint project ‘Assessing Climate Change Risks and Adaptation Strategy Development in the NSW Northern Rivers Region’ under the Local Adaptation Pathways Program (LAPP). The Program was overseen by Council’s then Sustainability Officer and facilitated by way of consultancy with input from a cross-section of Council staff during a series of workshops held in both Local Government Areas.

 

The LAPP project was based on the understanding that the level of uncertainty of climate change projections compounds the ability of local government to prioritise adaptation responses to unavoidable climate change. The project aimed to identify strategies to minimise potential adverse impacts on Council services and assets caused by climate change, develop and implement robust adaptation responses and integrate priority actions into Council’s management, operations and strategic planning framework. 

 

In August 2008, GHD were successful in being awarded the tender for the project and subsequently engaged to deliver the following process:

1.   Establish the context of climate change risk management for Byron / Tweed Shires.

2.   Deliver a Contextual Workshop for selected Council staff.

3.   Deliver a Risk Assessment Workshop for selected Council staff.

4.   Prepare a Risk Assessment Report for council operations and responsibilities.

5.   Deliver an Adaptation Workshop for selected Council staff.

6.   Prepare an Adaptation Action Plan for council operations and responsibilities.

 

The Risk Assessment and Adaptation Action Plan reports (Attachments 1 & 2) provided background, contextual information used in the preparation of the Byron Shire Climate Change Adaptation Implementation Schedule (Attachment 3). At the 27 May 2010 meeting, Council adopted the Implementation Schedule (Res-10-408). The Implementation Schedule included GHD’s suggested adaptation actions for a number of the hazards identified in the reports, as well as four further adaptation actions identified independently by Council (being action items 2.6, 4.4, 8.1 and 8.2 in the Implementation Schedule). The LAPP project concluded on 31 August 2009.

 

Complementing Council’s work with GHD around this time was the development of the Climate Change Strategic Planning Policy, which was adopted by Council on 12 November 2009 (Res-09-968). This policy is aimed mainly at future flood planning, but also incorporates coastline management planning and biodiversity planning. It was updated on 26 June 2014 (Res 14-315) and is scheduled for review again in 2019. Its three objectives are:

·    to set out Council’s accepted climate change parameters to inform the decision making process for strategic, infrastructure and operational planning;

·    to mitigate impacts associated with climate change on future generations through commitment to the precautionary principle; and

·    to review climate change parameters as further information becomes available from leading government organisations.

 

Delivery of actions

Whilst the 2010 Implementation Schedule was not resourced and therefore not implemented in a systematic manner, in the intervening years Council has delivered some (or part of some) of the actions through other mechanisms. Examples include:

 

·    Hazard 2: Increased Flood Level and FrequencyAdaptation Action 2.1: Review

infrastructure design standards for public works (including ensuring Council’s existing Climate Change Strategic Planning Policy is integrated with the Shire-wide Development Control Plan [DCP]).

-     All adopted flood studies and management plans post-2009 have incorporated climate change considerations e.g. see the Tallow Creek Floodplain Risk Management Study and Plan. Further, Council has since incorporated the Climate Change Strategic Planning Policy into Chapter C2 (clause C2.16) of DCP 2014 and the flood planning provisions in that Chapter were developed having regard to the overall framework of that policy. 

 

·    Hazard 3: Introduction and Proliferation of Exotic SpeciesAdaptation Action 3.3 Develop Pest Species Management Plan.

-     Council’s current Feral Animal Management Plan is being reviewed. A new Pest Animal Management Plan is being prepared in accordance with the NSW Biosecurity Act 2015 and Local Land Services Act 2013 and consultation with the community, to manage pest animals in the Shire. The draft plan was available for public comment for 6 weeks from 9 August to 21 September 2018. Submissions have been assessed and are being reported to the Biodiversity Advisory Committee in February 2019.

 

·    Hazard 6: Coastal Erosion and Impacts of Coastal DevelopmentAdaptation Action 6.2 Finalise and implement Coastal Zone Management Plan.

-     Council’s existing coastal management activities and previous Coastal Zone Management Plans (CZMPs) are currently being revised under the coastal planning process in accordance with the Coastal Management Act 2018. Council has commenced preparing a Coastal Management Program for the area from Cape Byron to South Golden Beach with Stage One of the process (Scoping Study) due to be completed by May 2019.

-     The new Coastal Management Program will focus on coastal hazards. Two areas of concern where property and/or infrastructure are at risk are Belongil Beach and New Brighton Beach, and the review will concentrate on these zones. Community consultation was held in late 2018 with public agency and Council engagement planned for February 2019.

 

While adaptation actions for waste management, infrastructure and processes were not included in the Implementation Schedule, the Resource Recovery Team has been working for a number of years to manage risks. Examples include:

·    continual upgrades to the Byron Resource Recovery Centre to improve environmental performance in extreme weather events;

·    production of compost to assist in local soil health and resistance to long drought periods;

·    cessation of landfilling operations in the Shire which reduces the environmental risks associated with an operational landfill during such events; and

·    disaster management planning to enable Council to better manage waste after extreme weather events.

 

Asset management in relation to flooding is included in the Implementation Schedule, however general asset management in relation to increased temperatures, etc. is not explicitly mentioned. Currently, Council’s Asset Management Policy and draft Transport Asset Management Plan do not specifically reference climate change adaptation measures. The Asset Management Team will soon be introducing a climate change factor into its Predictive Modelling for future asset capital works programs, but have advised that the factor is quite low so the impact may be negligible. Whether this factor will apply to new work only or to the renewal of existing infrastructure as well is yet to be confirmed. In relation to undertaking infrastructure works under increased temperature conditions, the Asset Management Team advised that the timing of works may be scheduled for early morning, late afternoon or overnight to ensure worker safety.

 

Regional adaptation measures

In addition to the above measures, Council participates in regional adaption measures coordinated by Rous County Council and the NSW Office of Environment and Heritage.

 

Rous County Council

Byron Shire Council supports Rous County Council (RCC) who is planning for a reduced water supply in the region. RCC performs three main functions for local councils in the NSW Far North Coast region: delivery of the bulk water supply, flood mitigation (not emergency response to flooding) and weed biosecurity. The second two functions are not relevant to climate change adaptation processes in Byron Shire.

 

The North Coast Region’s existing water sources can comfortably meet demand for water in the short to medium term; however the availability of water for North Coast LGAs in the future is much less certain. To maintain a sustainable water supply for the region in the face of a changing climate and increased population, RCC has developed a suit of three policy documents: Future Water Strategy, Drought Management Plan and Regional Demand Management Plan. The Future Water Strategy projects future water needs and provides a framework for long-term water planning and infrastructure development in the Region. The Drought Management Plan aims to ensure continued water supply during drought conditions in order to meet water user, public health and firefighting needs. The Regional Demand Management Plan describes the water supply demand management initiatives to be implemented in the local government areas of Ballina, Byron, Lismore and Richmond Valley over the next four years (2019 – 2022). As a constituent council, Byron Shire Council is directly affected by, and has actively participated in the development of all three documents.

 

NSW Office of Environment and Heritage

The NSW Office of Environment and Heritage (OEH) manages the state’s approach to climate change adaptation. At the information dissemination level, OEH administers the Adapt NSW website (https://climatechange.environment.nsw.gov.au/), the central information hub for understanding and adapting to climate change in NSW.

 

At the policy level, OEH developed a process to enable regional adaptation and planning by working with local government, agencies and other local stakeholders to identify and understand regional climate vulnerabilities. NSW local government areas were grouped into seven regional zones for assessment, and in 2014 the North Coast’s vulnerability to climate change was examined in the North Coast Integrated Regional Vulnerability Assessment (IRVA). Council staff participated in the workshops along with representatives from human services, landscapes and ecosystems, industries, settlements and infrastructure, and emergency management sectors in order to understand the vulnerability of the region to the forecast effects of climate change. The local knowledge was incorporated into two reports: 

·    North Coast IRVA Volume 1: identifies regional climate change vulnerabilities and canvasses action to reduce them through a coordinated response.

·    North Coast IRVA Volume 2: presents the detailed results of the sector workshops.

 

The North Coast Enabling Regional Adaptation (ERA) project is the follow-on to the IRVA process. In 2018, representatives from Council again attended workshops held across the North Coast to revise the initial vulnerability assessment and identify and develop adaptation models for the following key regional systems:

·    energy;

·    settlements;

·    tourism;

·    biodiversity;

·    food and agricultural;

·    emergency management;

·    infrastructure and water; and

·    communities.

 

The North Coast ERA report is currently being drafted. It will go to the Department of Premier and Cabinet’s Regional Leadership Executive for endorsement in the first half of 2019 before publication later this year. Examples of key projects likely to be included are as follows:

·    Climate resilient energy infrastructure and pricing project

·    Northern Rivers 100% Renewable Energy transition to 2050

·    North Coast Electric Vehicle Network

·    Climate Adaption into Business Management Practices

·    Social Licence to Support Sustainable Agriculture

·    Cross Dependency Risk Analysis of Critical Infrastructure

·    Investment Generation Innovation Hub

·    Mapping High Risk Assets to Identify Infrastructure Hot Spots

·    Person-Centred Emergency Preparedness

·    Sharing Knowledge Projects with Aboriginal and Torres Strait Islander Communities

·    Sustainable Housing Project

·    Urban Environment Intelligence

·    Sustainable Events Project.

 

Community led climate change

Council at the 31 October 2018 meeting resolved (18-680) to seek the Sustainability and Emission Reduction Advisory Committee’s (SERAC) input to convene a community-led Climate Emergency Guidance Group. The Guidance Group’s purpose is to develop a Shire-wide Community Climate Emergency Plan to further enhance resilience and reduce climate impacts.

 

Acknowledging that Council was not resourced to undertake the work, SERAC recommended amongst other things (Resolution 18-737) that Council support the guidance group through facilitation of the initial meeting. The first meeting of the Community Climate Change Emergency Plan was held on 7 December 2018 and successive meetings have been held since.

 

The work of the community led Guidance Group is focused on community adaptation to climate change impacts and will complement the work recommended to update the Climate Change Adaptation Implementation Plan for Council Operations.

 

Options

Council does not currently have a single overarching climate change adaptation document. The 2010 Byron Shire Climate Change Adaptation Implementation Schedule was not resourced and climate change adaptation processes have been incorporated into some Council policies, plans and strategies on an ad hoc basis since then. Given the amount of time that has passed since the adoption of the Implementation Schedule, a review would be necessary before considering implementing any more of the suggested adaptation actions. A review and update of the 2009 Risk Assessment and Adaptation Action Plan reports would be required to provide the background information necessary for updating the Implementation Schedule.

 

Council has two options going forward:

1)   Business as usual. Council can continue to incorporate climate change adaptation processes into its plans and policies on an ad hoc basis and as guided by the regional approach.

2)   Develop an updated Climate Change Adaptation Implementation Plan for Council Operations

This would include reviewing the existing Byron Tweed Climate Change Risk Assessment (Attachment 1) and Climate Change Adaptation Action Plan (Attachment 2) reports and the 2010 Byron Shire Climate Change Adaptation Implementation Schedule (Attachment 3). Costs would be in the order of $80,000. Funding to implement individual projects would be determined on a case by case basis and require separate funding support.

 

It is recommended that Council proceed with option 2.

 

References

 

United Nations Development Programme (2005). Adaptation Policy Frameworks for Climate Change. Developing Strategies, Policies and Measures, Ed. Bo Lim, Erika Spanger-Siegfried, Co-authors Ian Burton, Elizabeth Malone, and Saleemul Huq.

 

STRATEGIC CONSIDERATIONS

Community Strategic Plan and Operational Plan

CSP Objective

L2

CSP Strategy

L3

DP Action

L4

OP Activity

Community Objective 3:  We protect and enhance our natural environment

3.3

Partner to protect and enhance the health of the Shire’s coastlines, estuaries, waterways and catchments

3.3.1

Implement Coastal Management Program

3.3.1.1

Finalise and implement Coastal Zone Management Plan Eastern Precincts Byron Bay Embayment

Community Objective 3:  We protect and enhance our natural environment

3.3

Partner to protect and enhance the health of the Shire’s coastlines, estuaries, waterways and catchments

3.3.1

Implement Coastal Management Program

3.3.1.2

Prepare Coastal Management Program scoping study for New Brighton and Byron Bay Embayment Western Precincts 

 

Legal/Statutory/Policy Considerations

 

Byron Shire Council Climate Change Strategic Planning Policy

 

Financial Considerations

 

The costs to develop an updated Climate Change Adaptation Implementation Schedule will be considered in the preparation of the draft  2019/20 Operational Plan and budget.

 

Consultation and Engagement

 

Council staff

Coastal & Biodiversity Coordinator, Sustainable Environment & Economy

Manager Works, Infrastructure Services

Team Leader Infrastructure Planning, Infrastructure Services

Asset Management Coordinator, Infrastructure Services

Team Leader Resource Recovery and Quarry, Infrastructure Services 

Development Engineering Supervisor, Infrastructure Services

Flood and Drainage Engineer, Infrastructure Services

 

External to Council

Senior Team Leader, Regional Preparedness, NSW Office of Environment and Heritage


BYRON SHIRE COUNCIL

Staff Reports - Sustainable Environment and Economy                                     4.5

 

 

Report No. 4.5             Updates from Zero Emissions Byron and COREM

Directorate:                 Sustainable Environment and Economy

Report Author:           Michelle Chapman, Project Support Officer

File No:                        I2019/255

Theme:                         Sustainable Environment and Economy

                                      Planning Policy and Natural Environment

 

 

Summary:

 

Representatives from Zero Emissions Byron and COREM will provide an update from their organisations to the Committee.

 

  

 

RECOMMENDATION:

That the Sustainability and Emissions Reduction Advisory Committee note the updates from ZEB and COREM.

 

 

 

 


 

Report

 

Representatives from Zero Emissions Byron and COREM to provide verbal updates to the committee from their respective organisation.

 

STRATEGIC CONSIDERATIONS

 

Community Strategic Plan and Operational Plan

 

CSP Objective

L2

CSP Strategy

L3

DP Action

L4

OP Activity

Community Objective 3:  We protect and enhance our natural environment

3.2

Strive to become a sustainable community  

3.2.2

Support community environmental and sustainability projects

3.2.2.2

Encourage and support environmental and sustainable community activities and groups

 

 

Legal/Statutory/Policy Considerations

Draft Net Zero Emissions Strategy for Council Operations 2025

 

Financial Considerations

Nil

 

Consultation and Engagement

N/A

 

 


BYRON SHIRE COUNCIL

Staff Reports - Sustainable Environment and Economy                                     4.6

 

 

Report No. 4.6             Update from Cr Coorey - climate change issues

Directorate:                 Sustainable Environment and Economy

Report Author:           Hayley Briggs, Sustainability and Emissions Reduction Officer

File No:                        I2019/286

                                       

 

 

Summary:

 

Cr Coorey will provide a verbal update to the Committee on the following climate change issues:

 

1.       Climate Emergency Group; and

2.       ICLEI (International Council for Local Environment Initiatives) Regional Executive Committee meeting Cr Coorey attended in February.

 

 

  

 

RECOMMENDATION:

That the Sustainability and Emissions Reduction Advisory Committee note Cr Coorey’s update on climate change issues.

 

 

 

 

 


 

REPORT

 

Cr Coorey to provide a verbal update on the following climate change issues:

 

1.       Climate Emergency Group; and

2.       ICLEI Regional Executive Committee meeting Cr Coorey attended in February.

 

STRATEGIC CONSIDERATIONS

 

Community Strategic Plan and Operational Plan

CSP Objective

L2

CSP Strategy

L3

DP Action

L4

OP Activity

Community Objective 3:  We protect and enhance our natural environment

3.2

Strive to become a sustainable community  

3.2.2

Support community environmental and sustainability projects

3.2.2.2

Encourage and support environmental and sustainable community activities and groups

 

Legal/Statutory/Policy Considerations

n/a

 

Financial Considerations

n/a

 

Consultation and Engagement

n/a

 

 


BYRON SHIRE COUNCIL

Staff Reports - Sustainable Environment and Economy                                     4.7

 

 

Report No. 4.7             Issues raised with Council on renewable energy projects

Directorate:                 Sustainable Environment and Economy

Report Author:           Hayley Briggs, Sustainability and Emissions Reduction Officer

File No:                        I2019/287

                                       

 

 

Summary:

 

This report responds to a number of issues which have been raised with Council:

 

(a) the Clean Energy Council’s (CEC) Best Practice Charter for Renewable Energy Developments;

 

(b) the potential waiving of Development Assessment (DA) fees for solar installations;

 

(c) the potential for Council to identify Council land that is suitable for solar / renewables and which is in excess of its own requirements, and

 

(d) that a guide be created detailing how to proceed with solar / renewable development proposals including elements that may need to be addressed in DAs.  

 

 

  

 

RECOMMENDATION:

1. That the Sustainability and Emissions Reduction Advisory Committee note this report.

 

 

Attachments:

 

1        New South Wales (NSW) Legislation - Infrastructure SEPP 2007 - Part 3 - Division 4, E2019/14409 , page 35  

2        Byron Shire Council Planning Development and Building Fee Schedule 2017-18, E2019/14412 , page 46  

 

 


 

REPORT

 

This report responds to a number of issues which have been raised with Council:

 

 (a) Clean Energy Council’s Best Practice Charter for Renewable Energy Developments

 

Staff investigated the possibility of Council committing to the CEC’s Best Practice Charter for Renewable Energy Development. The response to this item is covered in the report to this meeting titled Sustainability and Emissions Reduction Projects – Update Report.

 

(b) The potential waiving of Development Assessment fees for solar installations

 

The waiving of DA fees for renewable energy developments has been researched and is not considered feasible at this time. The waiving of DA fees would be a decision of the full Council and would have a direct impact on staffing.

 

The City of Sydney has been referenced when discussing DA fee waivers for renewable energy developments. It should be noted that their waiver is only for installations less than $2 million.

 

Solar DA guidelines in Byron Shire

The fees for solar DAs in Byron Shire are governed by NSW legislation. The NSW Government has a tiered approvals regime for renewable energy systems, to ensure the level of assessment is appropriately tailored to the scale and type of the system. 

 

·     Large-scale renewable energy proposals

Under State Environmental Planning Policy (State and Regional Development) 2011, electricity generating works including renewable energy proposals such as wind or solar farms with a capital cost of more than $30 million (or $10 million in an environmentally sensitive area) are considered as State Significant Development under Part 4 of the Environmental Planning and Assessment Act 1979.

 

·     Small-scale renewable energy proposals

Under the State Environmental Planning Policy (Infrastructure) 2007 (“Infrastructure SEPP”), there are a range of assessment pathways for small-scale renewable energy proposals. These are tailored to the size, location and level of environmental impact of the proposal. Small-scale renewable energy systems covered by the Infrastructure SEPP include photovoltaic systems, solar hot water systems, solar air heating systems, small wind turbine systems and wind monitoring towers. Additional provisions may be included in the relevant local council’s Local Environmental Plan (LEP) and / or Development Control Plan (DCP).

 

Under the Infrastructure SEPP, Part 3, Division 4, Section 39 (Attachment 1) clarifies which renewable energy systems are exempt from development approval. Part 3.f.vi of the section stipulates that photovoltaic systems with the capacity to generate no more than 10 kW of electricity are exempt from development assessment. Systems over this size do require a DA, and therefore fall under Council’s Planning Development and Building Fee Schedule (Attachment 2). The estimated cost of the system will dictate the fee payable.

 

(c) The potential for Council to identify Council land that is suitable for solar / renewables and which is in excess of its own requirements.

 

Council land that is identified to be in excess of Council’s requirements will be offered to interested parties through an open and transparent Expression of Interest process, so as not to engage in corrupt conduct under the Independent Commission Against Corruption (ICAC) Act 1988.

 

(d) that a guide be created detailing how to proceed with solar/renewable development proposals including elements that may need to be addressed in relation to DAs.  

 

This advice can be provided through Council’s Development Support Staff as advice needs to be tailored to the specific proposal.

 

There is also an existing guideline on the Department of Planning’s web site that provides the community, industry, applicants and regulators with information on the planning framework for the assessment and approval of State significant large-scale solar energy projects. It provides a good overview of the assessment process in any case.

 

https://www.planning.nsw.gov.au/Policy-and-Legislation/Renewable-Energy/Large-scale-Solar-Energy-Guideline

 

 

STRATEGIC CONSIDERATIONS

 

Community Strategic Plan and Operational Plan

 

CSP Objective

L2

CSP Strategy

L3

DP Action

L4

OP Activity

Community Objective 3:  We protect and enhance our natural environment

3.2

Strive to become a sustainable community  

3.2.1

Work towards Council's zero-emissions  target

3.2.1.3

Build community Solar Farms at Brunswick Valley STP

Community Objective 3:  We protect and enhance our natural environment

3.2

Strive to become a sustainable community  

3.2.1

Work towards Council's zero-emissions  target

3.2.1.4

Implement actions to achieve zero emissions by 2025

Community Objective 3:  We protect and enhance our natural environment

3.2

Strive to become a sustainable community  

3.2.2

Support community environmental and sustainability projects

3.2.2.1

Provide environmental and sustainability information

Community Objective 3:  We protect and enhance our natural environment

3.2

Strive to become a sustainable community  

3.2.2

Support community environmental and sustainability projects

3.2.2.2

Encourage and support environmental and sustainable community activities and groups

 

Legal/Statutory/Policy Considerations

State Environmental Planning Policy (Infrastructure) 2007 

Independent Commission Against Corruption (ICAC) Act 1988

 

Financial Considerations

n/a

 

Consultation and Engagement

n/a

 


BYRON SHIRE COUNCIL

Staff Reports - Sustainable Environment and Economy                          4.7 - Attachment 1

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


BYRON SHIRE COUNCIL

Staff Reports - Sustainable Environment and Economy                          4.7 - Attachment 2

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator


 

PDF Creator